Power reduction for tower work on Monday, 8/10/2026

KSPB will be reducing its transmitter power on Monday, August 10, 2026 from approximately 9AM to 4PM so that a crew can safely access the tower for an inspection. KSPB’s signal may not reach as far as it normally does during this power reduction.

Our livestream will be unaffected.